Sitemap | Stock-Code:S000266 +  400-8828-058
  • NEWS
    • Corporate News
    • Industry News
    • Technology News
  • CORPORATE NEWS

SHARE

more
  • HOME
  • ABOUT US
  • NEWS
  • PRODUCTS
  • CASES
  • SERVICE SUPPORT
  • CONTACT US
  • CN
  • |
  • EN
    • Profile
    • Culture
    • Certificate
    • Development
    • Organization
    • Corporate News
    • Industry News
    • Technology News
    • Operating Videos
    • Catalogue
    • Certificates
    • Solutions
    • Cases
    • Customers
    • Technology Guidance
    • After-sale Service
    • Sale Market
    • Contact Information
    • Propaganda
    • Address
    • Recruit

    CORPORATE NEWS

    Brief introduction of relay protection

    click: 1402 2017-12-25

    The trend of deregulation in the power industry and the proliferation of digital electronic devices have deeply affected the operation of power utilities.
    Engineering departments, in particular, have to deal with the growing complexity of existing applications and the emergence of new applications.
    In this environment, many new challenges have been created, protecting systems engineers.
    The use of new business models, the deployment of microprocessors, the proliferation of smart devices, and more emphasis on power quality and the shortage of talent are the main ones.
    Therefore, more and more engineers must rely on advanced engineering tools to carry out their daily tasks.

    background

    In the past few years, the research and development of digital simulator relay tests have led to the development of a variety of configurations: (custom) closed-loop simulator
    (1) and the advanced low-cost relay test platform, kezunovich gallianovic

    (2) the main features of these tools are hardware flexibility, automation tasks, user-friendly graphical user interfaces, and simple integration with other applications.

    (3) after the success of the offline test, the system was installed in the energy enterprise transmission system, which has been working on substations since 1995.
    Subsequently, a new generation of systems is developed to handle multiple digital fault recording devices and convenient data archiving.

    (4) modeling and simulation of the protection system and its components is the latest tool to join our protection engineer suite.
    It allows protection engineers to configure them in a very simple and efficient manner

    The power system model relay system component used by the application.

    (5) pre-define the component library, which can be enhanced by adding custom developed components to the user.
    This makes the complex power system relay protection scheme, including multi-terminal and multi-relay application modeling and simulation.
    ring

    The environment is very flexible and connects to external software products.

    PREV Troubleshooting of the cluster of electronic instruments 2017-12-25
    NEXT Voltage transformer 2017-12-25
    RETURN LIST
    • HOME
    • ABOUT US
    • NEWS
    • PRODUCTS
    • CASES
    • SERVICE
    • CONTACT US

    NATIONAL SERVICE HOTLINE:

    400-8828-058

    Address: A134, 74 Baofeng 2nd Road, Qiaokou District, Wuhan City

    ©2008-2026 en.whdianqi.net 版权所有 鄂ICP备11010061号-2
    • ABOUT US
      • Profile
      • Culture
      • Certificate
      • Development
      • Organization
    • PRODUCTS
      • Series Parallel Resonant Test Series
      • Insulation Voltage Test Series
      • Transformer Calibration Test Series
      • Power Transformer Test Series
      • Motor Test Series
    • DATAS
      • Product Manuals
      • International Regulations
      • Technology Exchange
      • Technology articles
      • privacy policy
    HOME-HAUNENG Official Accounts

    HOME-HAUNENG COMPANY

    HOME-HAUNENG Sales Manager Official Accounts

    HOME-HAUNENG SALES MANAGER